Skip to main content
Our Projects

Signature Projects

Home / Projects
Our Scale 01/14
50 + Years of Experience
Signature Projects
Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road Ongoing Water & Sewerage Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road Makkah, Saudi Arabia Client: National Water Company (NWC) Construction of the main trunk sewer along the Old Jeddah Road serving the Northern Boulevard project, with diameters ranging from 1,800 mm down to 800 mm and a total length of approximately 4.5 km. View project Bahra Project — Surface-Water Level Reduction Network Ongoing Water & Sewerage Bahra Project — Surface-Water Level Reduction Network Bahra, Jeddah Governorate, Saudi Arabia Client: National Water Company (NWC) Construction of a surface-water level reduction network under the Dengue Fever Control Programme in Jeddah Governorate, serving the districts of Bahra, with a total length of approximately 50 km. View project Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail Ongoing Water & Sewerage Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail Jubail, Saudi Arabia + Telecom Client: National Water Company (NWC) The project covers three zones: • Zone 1: 73 km of gravity sewers together with a 5 km force main of 500 mm diameter, plus construction of the PS-J01 pumping station rated at 850 m³/hour. • Zone 2: 31 km of gravity sewers together with a 2 km force main of 200 mm diameter, plus construction of the PS-153/7 pumping station rated at 120 m³/hour. • Zone 3: an 8 km force main of 1,200 mm diameter, plus upgrading of the PS-14 pumping station from 3,600 to 7,200 m³/hour. View project Construction of Incomplete Sanitary Mainlines and Branch Networks in Jeddah — Contract 8 Ongoing Water & Sewerage Construction of Incomplete Sanitary Mainlines and Branch Networks in Jeddah — Contract 8 Jeddah, Saudi Arabia Client: National Water Company (NWC) The project completes the outstanding sewer trunk mains and constructs the branch networks serving the Al-Kawthar, Al-Hamdaniyah, Al-Manar and Al-Samer districts of Jeddah. The network totals 189,536 linear metres of GRP pipework with 2,785 manholes, in addition to the rehabilitation of 46,444 linear metres of existing networks and trunk mains. View project Design and Construction of Sewerage Networks, Pumping Stations and Trunk Sewer Lines for Al-Aziziyah and Other Districts, Al-Khobar Governorate — Phase 1, Part 2 Ongoing Water & Sewerage Design and Construction of Sewerage Networks, Pumping Stations and Trunk Sewer Lines for Al-Aziziyah and Other Districts, Al-Khobar Governorate — Phase 1, Part 2 Al-Khobar, Saudi Arabia + Telecom Client: National Water Company (NWC) The project lowers the surface-water table caused by uncontrolled wastewater discharge and addresses the environmental and public-health impacts of groundwater contamination, while extending sewerage service to the Al-Taawun, Al-Hamra, Ibn Sina, Al-Fawaziyah Industrial and Al-Sawari districts and further areas of Al-Khobar, in line with the National Water Company strategy, the Supply and Demand Document and Saudi Vision 2030. The scope comprises 95,867 linear metres of gravity sewers in diameters from 200 mm to 1,100 mm, 21,273 linear metres of force mains in diameters from 150 mm to 900 mm, the construction of four new pumping stations and the rehabilitation of six existing pumping stations. View project Stormwater Drainage for Area (BC) — Package No. 4 — Al-Rawdah District — 17168 Ongoing Water & Sewerage Stormwater Drainage for Area (BC) — Package No. 4 — Al-Rawdah District — 17168 Jeddah, Saudi Arabia Client: Jeddah Municipality The project lowers the level of standing surface water during rainfall by constructing a stormwater drainage network in the Al-Rawdah district. Runoff is collected from the catchment areas through parallel road drainage units (PRD) and catch basins; every storm inlet is connected to a manhole by FRP pipework, and the manholes are interconnected with reinforced-concrete pipes, so that stormwater is collected and conveyed through the drainage network. View project Al-Adl Project — Main Water Transmission Lines, Makkah Ongoing Water & Sewerage Al-Adl Project — Main Water Transmission Lines, Makkah Makkah, Saudi Arabia Client: National Water Company (NWC) Design and construction of main water transmission lines completing the water conveyance system of the Holy Capital, approximately 2,500 mm in diameter and about 7 km long, including the design and installation of all connections and valves, to link the Third Ring Road line with the Al-Adl area. View project Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh Ongoing Energy Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh Client: Saudi Electricity Company (SEC) Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in SALAH-ALDEEN  area Riyadh. The Scope of works includes associated works in remote end substation # 8088. The  substation shall be  equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through  Telecommunication system and gateway View project Power Supply To Jafurah Field Water Injection Hub S/S Project In Hawiyah Area Completed Energy Power Supply To Jafurah Field Water Injection Hub S/S Project In Hawiyah Area Provide detailed engineering and design, procure, supply and deliver all equipment and materials, construct, install, test, commission, and put into service a 115kV double circuit overhead transmission line from Hawiyah 230/115kV BSP to Jafurah Water Injection Hub Substation, including associated modification works at substations. View project Construction Ohtls Lilo Between Al-Hanakiyah And Al-Qassim 2 Completed Energy Construction Ohtls Lilo Between Al-Hanakiyah And Al-Qassim 2 Design, engineer, procure, supply, deliver, construct, install, test, commission, and put into service two (2) 380kV double circuit overhead transmission lines in LILO configuration between Al-Hanakiyah and Al-Qassim 2 BSP, including associated works at substations. View project Ashar Valley Boundary Treatments And Maraya Flood Mitigation Completed Infrastructure Ashar Valley Boundary Treatments And Maraya Flood Mitigation The general Scope of Services of the Ashar Valley Site Boundary Treatments and Maraya Flood Mitigation, project includes security boundary treatments designed to prevent the entrance of hostile vehicles to the valley and the protection of the Maraya Hall against possible flooding during an extreme storm event. View project Design and Build of Supporting Facilities for Terminal-0 Activation, OXAGON Port Completed Road Construction & Marine Works Design and Build of Supporting Facilities for Terminal-0 Activation, OXAGON Port + Telecom The scope of this project is the Design and Construction of the Container Activation Terminal T0, including:Customs Inspection buildings x 3Customs Office buildingAdministration OfficeClinicMaintenance buildingCanteen and LockersLeaky Container facilityComplete Infrastructure for the External General Layout Works View project
Contact Us