Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail

Home / Projects / Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail
Project Overview

The project covers three zones: • Zone 1: 73 km of gravity sewers together with a 5 km force main of 500 mm diameter, plus construction of the PS-J01 pumping station rated at 850 m³/hour. • Zone 2: 31 km of gravity sewers together with a 2 km force main of 200 mm diameter, plus construction of the PS-153/7 pumping station rated at 120 m³/hour. • Zone 3: an 8 km force main of 1,200 mm diameter, plus upgrading of the PS-14 pumping station from 3,600 to 7,200 m³/hour.

Client
National Water Company (NWC)
Location
Jubail, Saudi Arabia
Status
Ongoing
Business
Water & Sewerage
Secondary Classification
Project Key Figures
01/04
104km Gravity Sewer Length
01/04
Project Album
Related Projects
Stormwater Drainage for Area (BC) — Package No. 4 — Al-Rawdah District — 17168 Ongoing Water & Sewerage Stormwater Drainage for Area (BC) — Package No. 4 — Al-Rawdah District — 17168 Jeddah, Saudi Arabia Client: Jeddah Municipality The project lowers the level of standing surface water during rainfall by constructing a stormwater drainage network in the Al-Rawdah district. Runoff is collected from the catchment areas through parallel road drainage units (PRD) and catch basins; every storm inlet is connected to a manhole by FRP pipework, and the manholes are interconnected with reinforced-concrete pipes, so that stormwater is collected and conveyed through the drainage network. View project Construction of (9) GLS Storage Tanks for Potable Water in Tabuk City Completed Water & Sewerage Construction of (9) GLS Storage Tanks for Potable Water in Tabuk City Tabuk Client: Ministry of Environment, Water & Agriculture (MEWA) Design, supply, construction and testing of nine glass-fused-to-steel (GLS) potable water storage tanks in Tabuk, with the associated electromechanical works. View project Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road Ongoing Water & Sewerage Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road Makkah, Saudi Arabia Client: National Water Company (NWC) Construction of the main trunk sewer along the Old Jeddah Road serving the Northern Boulevard project, with diameters ranging from 1,800 mm down to 800 mm and a total length of approximately 4.5 km. View project East Hidd Water Pumping Station (EPC1) Completed Water & Sewerage East Hidd Water Pumping Station (EPC1) East Hidd, Kingdom of Bahrain Client: Ministry of Housing, Bahrain (MOH) Construction of the East Hidd water distribution station on a 6,200 m² site, comprising a semi-buried concrete reservoir of no less than two million gallons and an automated pumping station with variable-speed pumps rated at five million gallons per day, together with all site and utility works, delivered as an EPC contract. View project
View All Projects
Next Project Bahra Project — Surface-Water Level Reduction Network