Project Overview

Provide detailed engineering and design, procure, supply and deliver all equipment and materials, construct, install, test, commission, and put into service a 115kV double circuit overhead transmission line from Hawiyah 230/115kV BSP to Jafurah Water Injection Hub Substation, including associated modification works at substations.

Status
Completed
Business
Energy
Related Projects
Power Supply to King Faisal Hospital Jeddah Branch - 110 Kv U/G Cables Portion Completed Energy Power Supply to King Faisal Hospital Jeddah Branch - 110 Kv U/G Cables Portion Jeddah Client: Saudi Electricity Company (SEC) Installation of the 110 kV underground cable circuits feeding King Faisal Specialist Hospital & Research Centre in Jeddah, covering design, supply, construction and commissioning. View project Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt Completed Energy Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt 6th of October City, Egypt Client: New Urban Communities Authority (NUCA) Design, supply, construction, testing and commissioning of the 220/22/22 kV Eastern Extensions substation in 6th of October City, executed in joint venture with XD EGEMAC. View project Replacement of Existing 110 Kv OHTL by 110 Kv U/G Cable in Front of Jabal Ohud, Madinah Completed Energy Replacement of Existing 110 Kv OHTL by 110 Kv U/G Cable in Front of Jabal Ohud, Madinah Madinah Client: Saudi Electricity Company (SEC) Replacement of the existing 110 kV double-circuit overhead line with a double-circuit underground cable in front of Jabal Ohud in Madinah, covering design, supply, construction and commissioning. View project Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh Ongoing Energy Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh Client: Saudi Electricity Company (SEC) Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in SALAH-ALDEEN  area Riyadh. The Scope of works includes associated works in remote end substation # 8088. The  substation shall be  equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through  Telecommunication system and gateway View project
View All Projects
Next Project Reliability Enhancement For SS's Of Taif East Governorate (TEG) Discrete Group In Taif Area-OHTL