Skip to main content
Water & Sewerage

Stormwater Drainage for Area (BC) — Package No. 4 — Al-Rawdah District — 17168

Home / Projects / Stormwater Drainage for Area (BC) — Package No. 4 — Al-Rawdah District — 17168
Project Overview

The project lowers the level of standing surface water during rainfall by constructing a stormwater drainage network in the Al-Rawdah district. Runoff is collected from the catchment areas through parallel road drainage units (PRD) and catch basins; every storm inlet is connected to a manhole by FRP pipework, and the manholes are interconnected with reinforced-concrete pipes, so that stormwater is collected and conveyed through the drainage network.

Client
Jeddah Municipality
Location
Jeddah, Saudi Arabia
Status
Ongoing
Business
Water & Sewerage
Project Key Figures
01/04
Area (BC) — Package 4
01/04
Project Album
Related Projects
Construction of Incomplete Sanitary Mainlines and Branch Networks in Jeddah — Contract 8 Ongoing Water & Sewerage Construction of Incomplete Sanitary Mainlines and Branch Networks in Jeddah — Contract 8 Jeddah, Saudi Arabia Client: National Water Company (NWC) The project completes the outstanding sewer trunk mains and constructs the branch networks serving the Al-Kawthar, Al-Hamdaniyah, Al-Manar and Al-Samer districts of Jeddah. The network totals 189,536 linear metres of GRP pipework with 2,785 manholes, in addition to the rehabilitation of 46,444 linear metres of existing networks and trunk mains. View project East Hidd Water Pumping Station (EPC1) Completed Water & Sewerage East Hidd Water Pumping Station (EPC1) East Hidd, Kingdom of Bahrain Client: Ministry of Housing, Bahrain (MOH) Construction of the East Hidd water distribution station on a 6,200 m² site, comprising a semi-buried concrete reservoir of no less than two million gallons and an automated pumping station with variable-speed pumps rated at five million gallons per day, together with all site and utility works, delivered as an EPC contract. View project Design and Construction of Sewerage Networks, Pumping Stations and Trunk Sewer Lines for Al-Aziziyah and Other Districts, Al-Khobar Governorate — Phase 1, Part 2 Ongoing Water & Sewerage Design and Construction of Sewerage Networks, Pumping Stations and Trunk Sewer Lines for Al-Aziziyah and Other Districts, Al-Khobar Governorate — Phase 1, Part 2 Al-Khobar, Saudi Arabia Client: National Water Company (NWC) The project lowers the surface-water table caused by uncontrolled wastewater discharge and addresses the environmental and public-health impacts of groundwater contamination, while extending sewerage service to the Al-Taawun, Al-Hamra, Ibn Sina, Al-Fawaziyah Industrial and Al-Sawari districts and further areas of Al-Khobar, in line with the National Water Company strategy, the Supply and Demand Document and Saudi Vision 2030. The scope comprises 95,867 linear metres of gravity sewers in diameters from 200 mm to 1,100 mm, 21,273 linear metres of force mains in diameters from 150 mm to 900 mm, the construction of four new pumping stations and the rehabilitation of six existing pumping stations. View project Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08 Ongoing Water & Sewerage Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08 AlUla, Saudi Arabia Client: Royal Commission for AlUla (RCU) Water Reservoir Complex (HUB8): a 15,000 m³ reinforced-concrete strategic reservoir on the original site approved under the Land Use Site Clearance Application (LUSCA). Water Reservoir Complex (HUB6): a 50,000 m³ reinforced-concrete strategic reservoir, together with optional pricing for a 15,000 m³ one-day storage tank, on the site approved under the LUSCA. Enabling infrastructure for both hubs: access road and utility connections to the primary infrastructure (MV/LV power, ICT, water, wastewater), a SCADA system with a control room for decentralised operation and control, an electrical area, an inlet control and metering chamber, pipelines, mechanical and electrical equipment, instrumentation, fibre-optic provisions and conduits, a guard house with ablution facilities, fencing, security systems and stormwater drainage, as well as interfacing with the existing and under-construction National Water Company facilities at HUB6. View project
View All Projects
Next Project Southern Boulevard — Main Trunk Sewer along the Fourth Ring Road