Project Overview

Design, engineer, procure, supply, deliver, construct, install, test, commission, and put into service overhead transmission line works for enhancing reliability of Taif East Governorate substations, including integration with existing substations and associated systems.

Status
Completed
Business
Energy
Related Projects
Connection of New AsSafa BSP Substation #9014 with 132Kv Network Completed Energy Connection of New AsSafa BSP Substation #9014 with 132Kv Network Central Riyadh — Al-Batha Client: Saudi Electricity Company (SEC) The largest 132 kV underground transmission project in the Central Operating Area: 23 circuits and 308 km of cable along a 103 km route through 12 districts and 12 substations, with 107 km of fibre optics, 4.32 km of horizontal directional drilling, 738 insulated joints and 299,500 m² of asphalt. Contract value USD 102 million. View project Power Supply to Riyad Metro Substation (Metro Package 3) Completed Energy Power Supply to Riyad Metro Substation (Metro Package 3) Riyadh Client: Saudi Electricity Company (SEC) Main and standby power supply to the Riyadh Metro Line 2 substation from two bulk supply points: 10 circuits and 144 km of 33 kV underground cable along a 55 km route, 44.5 km of fibre optics, 300 insulated joints, 82,000 m² of asphalt and 400 m of horizontal directional drilling. View project Rehabilitation, Renovation and Upgrading of HV, MV and LV Power Systems and SCADA & Communication System in Jazan Seaport Completed Energy Rehabilitation, Renovation and Upgrading of HV, MV and LV Power Systems and SCADA & Communication System in Jazan Seaport Jazan Seaport Client: Saudi Ports Authority (MAWANI) Rehabilitation, renovation and upgrading of HV, MV and LV power systems across 22 substations at Jazan Seaport, and implementation of a SCADA and communications system covering 33 substations including transformers and ring main units. View project Reinforcement  of Hutat Sudair  132/33Kv Substation #8502 in Hutat Sudair Completed Energy Reinforcement of Hutat Sudair 132/33Kv Substation #8502 in Hutat Sudair Client: Saudi Electricity Company (SEC)  Reinforcement the capacity at existing 132/33kV S/S#8502  by adding 3rd 100 MVA 132/33kV transformer, extending the  existing 33kV switchgear at section ‘B’ by adding two(2) 800A feeder panels, and also adding new section “C” to meet load growth requirements of the area View project
View All Projects