Project Overview

Interconnection of the 380/132 kV Ashbailyah substation with the Riyadh network in two portions: 14 circuits and 138 km of underground cable along a 46 km route through six districts and 13 substations, with 46 km of fibre optics, 2.3 km of horizontal directional drilling, 333 insulated joints and 138,000 m² of asphalt.

Client
Saudi Electricity Company (SEC)
Location
Riyadh
Status
Completed
Business
Energy
Project Key Figures
01/04
14 Circuits
01/04
Project Album
Related Projects
Power Supply to Riyad Metro Substation (Metro Package 3) Completed Energy Power Supply to Riyad Metro Substation (Metro Package 3) Riyadh Client: Saudi Electricity Company (SEC) Main and standby power supply to the Riyadh Metro Line 2 substation from two bulk supply points: 10 circuits and 144 km of 33 kV underground cable along a 55 km route, 44.5 km of fibre optics, 300 insulated joints, 82,000 m² of asphalt and 400 m of horizontal directional drilling. View project Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh Ongoing Energy Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh Client: Saudi Electricity Company (SEC) Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in SALAH-ALDEEN  area Riyadh. The Scope of works includes associated works in remote end substation # 8088. The  substation shall be  equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through  Telecommunication system and gateway View project Power Supply To Jafurah Field Water Injection Hub S/S Project In Hawiyah Area Completed Energy Power Supply To Jafurah Field Water Injection Hub S/S Project In Hawiyah Area Provide detailed engineering and design, procure, supply and deliver all equipment and materials, construct, install, test, commission, and put into service a 115kV double circuit overhead transmission line from Hawiyah 230/115kV BSP to Jafurah Water Injection Hub Substation, including associated modification works at substations. View project Construction Ohtls Lilo Between Al-Hanakiyah And Al-Qassim 2 Completed Energy Construction Ohtls Lilo Between Al-Hanakiyah And Al-Qassim 2 Design, engineer, procure, supply, deliver, construct, install, test, commission, and put into service two (2) 380kV double circuit overhead transmission lines in LILO configuration between Al-Hanakiyah and Al-Qassim 2 BSP, including associated works at substations. View project