Energy

Interconnection of 380/110Kv Yanbu-3 SWCC BSP with 110Kv Yanbu & Badr Network

Home / Projects / Interconnection of 380/110Kv Yanbu-3 SWCC BSP with 110Kv Yanbu & Badr Network
Project Overview

Interconnection of the 380/110 kV Yanbu-3 desalination bulk supply point with the 110 kV Yanbu and Badr network, including design, supply, construction, protection-system modifications and commissioning.

Client
Saudi Electricity Company (SEC)
Location
Yanbu
Status
Completed
Business
Energy
Project Key Figures
01/02
Interconnection Voltage 380/110 kV
01/02
Related Projects
Connection of New AsSafa BSP Substation #9014 with 132Kv Network Completed Energy Connection of New AsSafa BSP Substation #9014 with 132Kv Network Central Riyadh — Al-Batha Client: Saudi Electricity Company (SEC) The largest 132 kV underground transmission project in the Central Operating Area: 23 circuits and 308 km of cable along a 103 km route through 12 districts and 12 substations, with 107 km of fibre optics, 4.32 km of horizontal directional drilling, 738 insulated joints and 299,500 m² of asphalt. Contract value USD 102 million. View project Interconnection of 132/11 Kv Asayel, Forsan & Schools Substations with 132 Kv Network in Dubai Completed Energy Interconnection of 132/11 Kv Asayel, Forsan & Schools Substations with 132 Kv Network in Dubai Dubai, United Arab Emirates Client: Dubai Electricity & Water Authority (DEWA) Loop-in/loop-out interconnection of 132 kV circuits between the Asayel, Forsan and Schools substations and several bulk supply points in Dubai, executed in three portions covering design, supply, construction and commissioning. View project Interconnection of 380/132 Kv Ashbailyah Substation with 132 Kv Network in Riyadh Completed Energy Interconnection of 380/132 Kv Ashbailyah Substation with 132 Kv Network in Riyadh Riyadh Client: Saudi Electricity Company (SEC) Interconnection of the 380/132 kV Ashbailyah substation with the Riyadh network in two portions: 14 circuits and 138 km of underground cable along a 46 km route through six districts and 13 substations, with 46 km of fibre optics, 2.3 km of horizontal directional drilling, 333 insulated joints and 138,000 m² of asphalt. View project Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt Completed Energy Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt 6th of October City, Egypt Client: New Urban Communities Authority (NUCA) Design, supply, construction, testing and commissioning of the 220/22/22 kV Eastern Extensions substation in 6th of October City, executed in joint venture with XD EGEMAC. View project