Project Overview

Rehabilitation, renovation and upgrading of HV, MV and LV power systems across 22 substations at Jazan Seaport, and implementation of a SCADA and communications system covering 33 substations including transformers and ring main units.

Client
Saudi Ports Authority (MAWANI)
Location
Jazan Seaport
Status
Completed
Business
Energy
Project Key Figures
01/02
22 Substations Rehabilitated
01/02
Related Projects
Interconnection of 380/110Kv Yanbu-3 SWCC BSP with 110Kv Yanbu & Badr Network Completed Energy Interconnection of 380/110Kv Yanbu-3 SWCC BSP with 110Kv Yanbu & Badr Network Yanbu Client: Saudi Electricity Company (SEC) Interconnection of the 380/110 kV Yanbu-3 desalination bulk supply point with the 110 kV Yanbu and Badr network, including design, supply, construction, protection-system modifications and commissioning. View project Reinforcement  of Hutat Sudair  132/33Kv Substation #8502 in Hutat Sudair Completed Energy Reinforcement of Hutat Sudair 132/33Kv Substation #8502 in Hutat Sudair Client: Saudi Electricity Company (SEC)  Reinforcement the capacity at existing 132/33kV S/S#8502  by adding 3rd 100 MVA 132/33kV transformer, extending the  existing 33kV switchgear at section ‘B’ by adding two(2) 800A feeder panels, and also adding new section “C” to meet load growth requirements of the area View project Interconnection of 380/132 Kv Ashbailyah Substation with 132 Kv Network in Riyadh Completed Energy Interconnection of 380/132 Kv Ashbailyah Substation with 132 Kv Network in Riyadh Riyadh Client: Saudi Electricity Company (SEC) Interconnection of the 380/132 kV Ashbailyah substation with the Riyadh network in two portions: 14 circuits and 138 km of underground cable along a 46 km route through six districts and 13 substations, with 46 km of fibre optics, 2.3 km of horizontal directional drilling, 333 insulated joints and 138,000 m² of asphalt. View project Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh Ongoing Energy Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh Client: Saudi Electricity Company (SEC) Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in SALAH-ALDEEN  area Riyadh. The Scope of works includes associated works in remote end substation # 8088. The  substation shall be  equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through  Telecommunication system and gateway View project
View All Projects
Next Project Construction of Water Transmission Line and Storage Tanks in Arar City