Project Overview

Replacement of the existing 110 kV double-circuit overhead line with a double-circuit underground cable in front of Jabal Ohud in Madinah, covering design, supply, construction and commissioning.

Client
Saudi Electricity Company (SEC)
Location
Madinah
Status
Completed
Business
Energy
Project Key Figures
01/02
Operating Voltage 110 kV
01/02
Related Projects
Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh Ongoing Energy Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh Client: Saudi Electricity Company (SEC) Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in SALAH-ALDEEN  area Riyadh. The Scope of works includes associated works in remote end substation # 8088. The  substation shall be  equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through  Telecommunication system and gateway View project Power Supply to Dammam Housing Project Completed Energy Power Supply to Dammam Housing Project Dammam Client: Saudi Electricity Company (SEC) Power supply to the Dammam Housing project through 14 circuits and 219 km of 115 kV underground cable along a 73 km route, with 42 km of fibre optics, 687 insulated joints, 99,000 m² of asphalt, 1,136 m of horizontal directional drilling and six kilometres of roadworks, including crossings beneath Aramco pipelines. View project 380/110 KV BSP and Existing Umlujj North (UMN) 380/132 KV BSP (Ckt 1 & 2) Completed Energy 380/110 KV BSP and Existing Umlujj North (UMN) 380/132 KV BSP (Ckt 1 & 2) Yanbu & Umluj Client: Saudi Electricity Company (SEC) Design, supply and construction of a 380 kV double-circuit overhead transmission line with two OPGW earth wires linking the Yanbu and Umluj North bulk supply points, over a route of approximately 185 km, delivered as an EPC contract. View project Interconnection of 132/11 Kv Asayel, Forsan & Schools Substations with 132 Kv Network in Dubai Completed Energy Interconnection of 132/11 Kv Asayel, Forsan & Schools Substations with 132 Kv Network in Dubai Dubai, United Arab Emirates Client: Dubai Electricity & Water Authority (DEWA) Loop-in/loop-out interconnection of 132 kV circuits between the Asayel, Forsan and Schools substations and several bulk supply points in Dubai, executed in three portions covering design, supply, construction and commissioning. View project
View All Projects
Next Project Rehabilitation, Renovation and Upgrading of HV, MV and LV Power Systems and SCADA & Communication System in Jazan Seaport