Project Overview

Water Reservoir Complex (HUB8): a 15,000 m³ reinforced-concrete strategic reservoir on the original site approved under the Land Use Site Clearance Application (LUSCA). Water Reservoir Complex (HUB6): a 50,000 m³ reinforced-concrete strategic reservoir, together with optional pricing for a 15,000 m³ one-day storage tank, on the site approved under the LUSCA. Enabling infrastructure for both hubs: access road and utility connections to the primary infrastructure (MV/LV power, ICT, water, wastewater), a SCADA system with a control room for decentralised operation and control, an electrical area, an inlet control and metering chamber, pipelines, mechanical and electrical equipment, instrumentation, fibre-optic provisions and conduits, a guard house with ablution facilities, fencing, security systems and stormwater drainage, as well as interfacing with the existing and under-construction National Water Company facilities at HUB6.

Client
Royal Commission for AlUla (RCU)
Location
AlUla, Saudi Arabia
Status
Ongoing
Business
Water & Sewerage
Secondary Classification
Project Key Figures
01/04
50,000m3 Hub 6 Reservoir Capacity
01/04
Project Album
Related Projects
East Hidd Water Pumping Station (EPC1) Completed Water & Sewerage East Hidd Water Pumping Station (EPC1) East Hidd, Kingdom of Bahrain Client: Ministry of Housing, Bahrain (MOH) Construction of the East Hidd water distribution station on a 6,200 m² site, comprising a semi-buried concrete reservoir of no less than two million gallons and an automated pumping station with variable-speed pumps rated at five million gallons per day, together with all site and utility works, delivered as an EPC contract. View project Southern Boulevard — Main Trunk Sewer along the Fourth Ring Road Ongoing Water & Sewerage Southern Boulevard — Main Trunk Sewer along the Fourth Ring Road Makkah, Saudi Arabia Client: National Water Company (NWC) Construction of the main trunk sewer along the Fourth Ring Road serving the Southern Boulevard project in Makkah, approximately 2,400 mm in diameter and about 13 km in total length. View project Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road Ongoing Water & Sewerage Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road Makkah, Saudi Arabia Client: National Water Company (NWC) Construction of the main trunk sewer along the Old Jeddah Road serving the Northern Boulevard project, with diameters ranging from 1,800 mm down to 800 mm and a total length of approximately 4.5 km. View project Al-Adl Project — Main Water Transmission Lines, Makkah Ongoing Water & Sewerage Al-Adl Project — Main Water Transmission Lines, Makkah Makkah, Saudi Arabia Client: National Water Company (NWC) Design and construction of main water transmission lines completing the water conveyance system of the Holy Capital, approximately 2,500 mm in diameter and about 7 km long, including the design and installation of all connections and valves, to link the Third Ring Road line with the Al-Adl area. View project
View All Projects
Next Project Design and Construction of Sewerage Networks, Pumping Stations and Trunk Sewer Lines for Al-Aziziyah and Other Districts, Al-Khobar Governorate — Phase 1, Part 2