Project Overview

Construction of the main trunk sewer along the Fourth Ring Road serving the Southern Boulevard project in Makkah, approximately 2,400 mm in diameter and about 13 km in total length.

Client
National Water Company (NWC)
Location
Makkah, Saudi Arabia
Status
Ongoing
Business
Water & Sewerage
Project Key Figures
01/03
2,400mm Pipe Diameter
01/03
Project Album
Related Projects
Bahra Project — Surface-Water Level Reduction Network Ongoing Water & Sewerage Bahra Project — Surface-Water Level Reduction Network Bahra, Jeddah Governorate, Saudi Arabia Client: National Water Company (NWC) Construction of a surface-water level reduction network under the Dengue Fever Control Programme in Jeddah Governorate, serving the districts of Bahra, with a total length of approximately 50 km. View project Al-Adl Project — Main Water Transmission Lines, Makkah Ongoing Water & Sewerage Al-Adl Project — Main Water Transmission Lines, Makkah Makkah, Saudi Arabia Client: National Water Company (NWC) Design and construction of main water transmission lines completing the water conveyance system of the Holy Capital, approximately 2,500 mm in diameter and about 7 km long, including the design and installation of all connections and valves, to link the Third Ring Road line with the Al-Adl area. View project Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail Ongoing Water & Sewerage Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail Jubail, Saudi Arabia Client: National Water Company (NWC) The project covers three zones: • Zone 1: 73 km of gravity sewers together with a 5 km force main of 500 mm diameter, plus construction of the PS-J01 pumping station rated at 850 m³/hour. • Zone 2: 31 km of gravity sewers together with a 2 km force main of 200 mm diameter, plus construction of the PS-153/7 pumping station rated at 120 m³/hour. • Zone 3: an 8 km force main of 1,200 mm diameter, plus upgrading of the PS-14 pumping station from 3,600 to 7,200 m³/hour. View project Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road Ongoing Water & Sewerage Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road Makkah, Saudi Arabia Client: National Water Company (NWC) Construction of the main trunk sewer along the Old Jeddah Road serving the Northern Boulevard project, with diameters ranging from 1,800 mm down to 800 mm and a total length of approximately 4.5 km. View project
View All Projects
Next Project Framework Agreement for Infrastructure Works with Roshn Group Company