Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh

Home / Projects / Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh
Project Overview

Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in AL-NADA  area Riyadh. The Scope of works includes associated works in remote end substation # 9008. The  substation shall be  equipped   with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through a Telecommunication system and gateway

Client
Saudi Electricity Company (SEC)
Status
Completed
Business
Energy
Project Key Figures
01/03
3 67 MVA
01/03
Project Album
Related Projects
Rehabilitation, Renovation and Upgrading of HV, MV and LV Power Systems and SCADA & Communication System in Jazan Seaport Completed Energy Rehabilitation, Renovation and Upgrading of HV, MV and LV Power Systems and SCADA & Communication System in Jazan Seaport Jazan Seaport Client: Saudi Ports Authority (MAWANI) Rehabilitation, renovation and upgrading of HV, MV and LV power systems across 22 substations at Jazan Seaport, and implementation of a SCADA and communications system covering 33 substations including transformers and ring main units. View project Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh Ongoing Energy Construction of 132/13.8 Kv Salahualdeen Substation #8219 in Riyadh Client: Saudi Electricity Company (SEC) Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in SALAH-ALDEEN  area Riyadh. The Scope of works includes associated works in remote end substation # 8088. The  substation shall be  equipped with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through  Telecommunication system and gateway View project Connection of New AsSafa BSP Substation #9014 with 132Kv Network Completed Energy Connection of New AsSafa BSP Substation #9014 with 132Kv Network Central Riyadh — Al-Batha Client: Saudi Electricity Company (SEC) The largest 132 kV underground transmission project in the Central Operating Area: 23 circuits and 308 km of cable along a 103 km route through 12 districts and 12 substations, with 107 km of fibre optics, 4.32 km of horizontal directional drilling, 738 insulated joints and 299,500 m² of asphalt. Contract value USD 102 million. View project Power Supply To Jafurah Field Water Injection Hub S/S Project In Hawiyah Area Completed Energy Power Supply To Jafurah Field Water Injection Hub S/S Project In Hawiyah Area Provide detailed engineering and design, procure, supply and deliver all equipment and materials, construct, install, test, commission, and put into service a 115kV double circuit overhead transmission line from Hawiyah 230/115kV BSP to Jafurah Water Injection Hub Substation, including associated modification works at substations. View project
View All Projects
Next Project Construction of 132/13.8 Kv Al-Morabaa Substation #8187 in Riyadh