Power Supply to King Faisal Hospital Jeddah Branch - 110 Kv U/G Cables Portion

Home / Projects / Power Supply to King Faisal Hospital Jeddah Branch - 110 Kv U/G Cables Portion
Project Overview

Installation of the 110 kV underground cable circuits feeding King Faisal Specialist Hospital & Research Centre in Jeddah, covering design, supply, construction and commissioning.

Client
Saudi Electricity Company (SEC)
Location
Jeddah
Status
Completed
Business
Energy
Project Key Figures
01/02
Operating Voltage 110 kV
01/02
Related Projects
Power Supply to Riyad Metro Substation (Metro Package 3) Completed Energy Power Supply to Riyad Metro Substation (Metro Package 3) Riyadh Client: Saudi Electricity Company (SEC) Main and standby power supply to the Riyadh Metro Line 2 substation from two bulk supply points: 10 circuits and 144 km of 33 kV underground cable along a 55 km route, 44.5 km of fibre optics, 300 insulated joints, 82,000 m² of asphalt and 400 m of horizontal directional drilling. View project Interconnection of 132/11 Kv Asayel, Forsan & Schools Substations with 132 Kv Network in Dubai Completed Energy Interconnection of 132/11 Kv Asayel, Forsan & Schools Substations with 132 Kv Network in Dubai Dubai, United Arab Emirates Client: Dubai Electricity & Water Authority (DEWA) Loop-in/loop-out interconnection of 132 kV circuits between the Asayel, Forsan and Schools substations and several bulk supply points in Dubai, executed in three portions covering design, supply, construction and commissioning. View project Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt Completed Energy Construction of 220/22/22 Kv Eastern Extensions Substation, 6th October City, Egypt 6th of October City, Egypt Client: New Urban Communities Authority (NUCA) Design, supply, construction, testing and commissioning of the 220/22/22 kV Eastern Extensions substation in 6th of October City, executed in joint venture with XD EGEMAC. View project Power Supply To Jafurah Field Water Injection Hub S/S Project In Hawiyah Area Completed Energy Power Supply To Jafurah Field Water Injection Hub S/S Project In Hawiyah Area Provide detailed engineering and design, procure, supply and deliver all equipment and materials, construct, install, test, commission, and put into service a 115kV double circuit overhead transmission line from Hawiyah 230/115kV BSP to Jafurah Water Injection Hub Substation, including associated modification works at substations. View project
View All Projects
Next Project Replacement of Existing 110 Kv OHTL by 110 Kv U/G Cable in Front of Jabal Ohud, Madinah