Reinforcement of Hutat Sudair 132/33Kv Substation #8502 in Hutat Sudair

Home / Projects / Reinforcement of Hutat Sudair 132/33Kv Substation #8502 in Hutat Sudair
Project Overview

 Reinforcement the capacity at existing 132/33kV S/S#8502  by adding 3rd 100 MVA 132/33kV transformer, extending the  existing 33kV switchgear at section ‘B’ by adding two(2) 800A feeder panels, and also adding new section “C” to meet load growth requirements of the area

Client
Saudi Electricity Company (SEC)
Status
Completed
Business
Energy
Project Key Figures
01/02
1 100 MVA
01/02
Project Album
Related Projects
Replacement of Existing 110 Kv OHTL by 110 Kv U/G Cable in Front of Jabal Ohud, Madinah Completed Energy Replacement of Existing 110 Kv OHTL by 110 Kv U/G Cable in Front of Jabal Ohud, Madinah Madinah Client: Saudi Electricity Company (SEC) Replacement of the existing 110 kV double-circuit overhead line with a double-circuit underground cable in front of Jabal Ohud in Madinah, covering design, supply, construction and commissioning. View project Power Supply To Jafurah Field Water Injection Hub S/S Project In Hawiyah Area Completed Energy Power Supply To Jafurah Field Water Injection Hub S/S Project In Hawiyah Area Provide detailed engineering and design, procure, supply and deliver all equipment and materials, construct, install, test, commission, and put into service a 115kV double circuit overhead transmission line from Hawiyah 230/115kV BSP to Jafurah Water Injection Hub Substation, including associated modification works at substations. View project Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh Completed Energy Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh Client: Saudi Electricity Company (SEC) Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in AL-NADA  area Riyadh. The Scope of works includes associated works in remote end substation # 9008. The  substation shall be  equipped   with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through a Telecommunication system and gateway View project Construction of Qassim 380 Kv OHTL Completed Energy Construction of Qassim 380 Kv OHTL Al-Qassim & Al-Zulfi Client: Saudi Electricity Company (SEC) Construction of 380 kV overhead transmission lines and their loop-in/loop-out connection between the Qassim, Sudair and Al-Zulfi substations, executed in two portions in a joint venture. View project
View All Projects
Next Project Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh