Interconnection of 132/11 Kv Asayel, Forsan & Schools Substations with 132 Kv Network in Dubai

Home / Projects / Interconnection of 132/11 Kv Asayel, Forsan & Schools Substations with 132 Kv Network in Dubai
Project Overview

Loop-in/loop-out interconnection of 132 kV circuits between the Asayel, Forsan and Schools substations and several bulk supply points in Dubai, executed in three portions covering design, supply, construction and commissioning.

Client
Dubai Electricity & Water Authority (DEWA)
Location
Dubai, United Arab Emirates
Status
Completed
Business
Energy
Project Key Figures
01/02
3 Execution Portions
01/02
Project Album
Related Projects
Rehabilitation, Renovation and Upgrading of HV, MV and LV Power Systems and SCADA & Communication System in Jazan Seaport Completed Energy Rehabilitation, Renovation and Upgrading of HV, MV and LV Power Systems and SCADA & Communication System in Jazan Seaport Jazan Seaport Client: Saudi Ports Authority (MAWANI) Rehabilitation, renovation and upgrading of HV, MV and LV power systems across 22 substations at Jazan Seaport, and implementation of a SCADA and communications system covering 33 substations including transformers and ring main units. View project Interconnection of 380/132 Kv Ashbailyah Substation with 132 Kv Network in Riyadh Completed Energy Interconnection of 380/132 Kv Ashbailyah Substation with 132 Kv Network in Riyadh Riyadh Client: Saudi Electricity Company (SEC) Interconnection of the 380/132 kV Ashbailyah substation with the Riyadh network in two portions: 14 circuits and 138 km of underground cable along a 46 km route through six districts and 13 substations, with 46 km of fibre optics, 2.3 km of horizontal directional drilling, 333 insulated joints and 138,000 m² of asphalt. View project Power Supply to Riyad Metro Substation (Metro Package 3) Completed Energy Power Supply to Riyad Metro Substation (Metro Package 3) Riyadh Client: Saudi Electricity Company (SEC) Main and standby power supply to the Riyadh Metro Line 2 substation from two bulk supply points: 10 circuits and 144 km of 33 kV underground cable along a 55 km route, 44.5 km of fibre optics, 300 insulated joints, 82,000 m² of asphalt and 400 m of horizontal directional drilling. View project Construction of Qassim 380 Kv OHTL Completed Energy Construction of Qassim 380 Kv OHTL Al-Qassim & Al-Zulfi Client: Saudi Electricity Company (SEC) Construction of 380 kV overhead transmission lines and their loop-in/loop-out connection between the Qassim, Sudair and Al-Zulfi substations, executed in two portions in a joint venture. View project
View All Projects
Next Project Power Supply to Riyad Metro Substation (Metro Package 3)