Construction of (9) GLS Storage Tanks for Potable Water in Tabuk City

Home / Projects / Construction of (9) GLS Storage Tanks for Potable Water in Tabuk City
Project Overview

Design, supply, construction and testing of nine glass-fused-to-steel (GLS) potable water storage tanks in Tabuk, with the associated electromechanical works.

Client
Ministry of Environment, Water & Agriculture (MEWA)
Location
Tabuk
Status
Completed
Business
Water & Sewerage
Project Key Figures
01/02
9 Tanks
01/02
Related Projects
Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road Ongoing Water & Sewerage Northern Boulevard — Main Trunk Sewer along the Old Jeddah Road Makkah, Saudi Arabia Client: National Water Company (NWC) Construction of the main trunk sewer along the Old Jeddah Road serving the Northern Boulevard project, with diameters ranging from 1,800 mm down to 800 mm and a total length of approximately 4.5 km. View project Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08 Ongoing Water & Sewerage Design and Build of Strategic Potable Water Reservoirs — Phase 1, Hub 06 & Hub 08 AlUla, Saudi Arabia Client: Royal Commission for AlUla (RCU) Water Reservoir Complex (HUB8): a 15,000 m³ reinforced-concrete strategic reservoir on the original site approved under the Land Use Site Clearance Application (LUSCA). Water Reservoir Complex (HUB6): a 50,000 m³ reinforced-concrete strategic reservoir, together with optional pricing for a 15,000 m³ one-day storage tank, on the site approved under the LUSCA. Enabling infrastructure for both hubs: access road and utility connections to the primary infrastructure (MV/LV power, ICT, water, wastewater), a SCADA system with a control room for decentralised operation and control, an electrical area, an inlet control and metering chamber, pipelines, mechanical and electrical equipment, instrumentation, fibre-optic provisions and conduits, a guard house with ablution facilities, fencing, security systems and stormwater drainage, as well as interfacing with the existing and under-construction National Water Company facilities at HUB6. View project Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail Ongoing Water & Sewerage Capacity Upgrade of PS-14 Pumping Station and Associated Force Main, Jubail Jubail, Saudi Arabia Client: National Water Company (NWC) The project covers three zones: • Zone 1: 73 km of gravity sewers together with a 5 km force main of 500 mm diameter, plus construction of the PS-J01 pumping station rated at 850 m³/hour. • Zone 2: 31 km of gravity sewers together with a 2 km force main of 200 mm diameter, plus construction of the PS-153/7 pumping station rated at 120 m³/hour. • Zone 3: an 8 km force main of 1,200 mm diameter, plus upgrading of the PS-14 pumping station from 3,600 to 7,200 m³/hour. View project Construction of Incomplete Sanitary Mainlines and Branch Networks in Jeddah — Contract 8 Ongoing Water & Sewerage Construction of Incomplete Sanitary Mainlines and Branch Networks in Jeddah — Contract 8 Jeddah, Saudi Arabia Client: National Water Company (NWC) The project completes the outstanding sewer trunk mains and constructs the branch networks serving the Al-Kawthar, Al-Hamdaniyah, Al-Manar and Al-Samer districts of Jeddah. The network totals 189,536 linear metres of GRP pipework with 2,785 manholes, in addition to the rehabilitation of 46,444 linear metres of existing networks and trunk mains. View project