Construction of (4) 132 Kv Grid Substations in Central Region (S/S 8187, 8219, 8220, 8502)

Home / Projects / Construction of (4) 132 Kv Grid Substations in Central Region (S/S 8187, 8219, 8220, 8502)
Project Overview

A package of four lump-sum turnkey contracts for the design, supply and construction of 132 kV grid substations in the Central Region, covering Al-Murabba North, Salah Al-Din and Al-Nada substations in Riyadh and the reinforcement of Hotat Sudair, through to final handover in full operating condition.

Client
Saudi Electricity Company (SEC)
Location
Riyadh & Hotat Sudair
Status
Completed
Business
Energy
Project Key Figures
01/02
4 Substations
01/02
Related Projects
Construction of Qassim 380 Kv OHTL Completed Energy Construction of Qassim 380 Kv OHTL Al-Qassim & Al-Zulfi Client: Saudi Electricity Company (SEC) Construction of 380 kV overhead transmission lines and their loop-in/loop-out connection between the Qassim, Sudair and Al-Zulfi substations, executed in two portions in a joint venture. View project 380/110 KV BSP and Existing Umlujj North (UMN) 380/132 KV BSP (Ckt 1 & 2) Completed Energy 380/110 KV BSP and Existing Umlujj North (UMN) 380/132 KV BSP (Ckt 1 & 2) Yanbu & Umluj Client: Saudi Electricity Company (SEC) Design, supply and construction of a 380 kV double-circuit overhead transmission line with two OPGW earth wires linking the Yanbu and Umluj North bulk supply points, over a route of approximately 185 km, delivered as an EPC contract. View project Connection of New AsSafa BSP Substation #9014 with 132Kv Network Completed Energy Connection of New AsSafa BSP Substation #9014 with 132Kv Network Central Riyadh — Al-Batha Client: Saudi Electricity Company (SEC) The largest 132 kV underground transmission project in the Central Operating Area: 23 circuits and 308 km of cable along a 103 km route through 12 districts and 12 substations, with 107 km of fibre optics, 4.32 km of horizontal directional drilling, 738 insulated joints and 299,500 m² of asphalt. Contract value USD 102 million. View project Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh Completed Energy Construction of Al-Nada 132/13.8 Kv Substation #8220 in Riyadh Client: Saudi Electricity Company (SEC) Construction of a new 132/13.8kV indoor GIS type Substation, arranged in a double-bus-single breaker configuration in AL-NADA  area Riyadh. The Scope of works includes associated works in remote end substation # 9008. The  substation shall be  equipped   with Substation Automation System (SAS) and will be remotely controlled from the SEC Power Control Center (PCC) through a Telecommunication system and gateway View project